Asking
$ 3,599,000
'Change Order' is one of the newest Hatteras GT59s available. She is broken in and ready for the next owner. This 3 stateroom, 2 head layout with the master aft and tackle room provides the comfort and fishability for long extended fishing excursions. The main deck layout has the preferred peninsula galley with subzero drawer fridges, range and a dinette to stbd. Also to stbd is a popup TV in the Satin teak cabinet and bottle storage with icemaker. The salon sofa has storage and a coffee table with storage that can raise to dining level.Â
Equipped with Cat C32s, she cruises at 30 knots and has a top end of 37 knots. These engines are still under Platinum Plus warranty until 2025 and can be extended further.Â
All new Garmin electronics package in 2022.Â
 Â
Interior Cabinetry In Satin Finished TeakÂ
Leather Sofa With Storage And Pull Out BerthÂ
Teak Coffee Table In High Gloss Teak With Flip Up Desk Style Top, StorageÂ
Leather Dinette With Storage Under And High Gloss Teak Table
Carpet Flooring With Amtico Floor At Entry Door
Samsung 40" Tv With Electric Lift In Teak Counter Fwd Of Dinette
Denon Salon Av/Receiver - Model avrx3600hbke3Â
KVH Sat TV
Samsung Blue-Ray Player
Definitive Technology Subwoofer - Model Supercube 2000
Two Jenn-Air Drawer Fridges (2 Drawers Each) - Model judfp242hxo1
Miele 4 Burner Electric Cooktop - Model km56212
Sharp Microwave - Model R-1881lsy
U-Line Icemaker Opposite Galley - Model uln-B195cb-03a
Emerson Garbage Disposal In Stainless Steel Sink
Corian Blue CountertopsÂ
Storage Cabinets & Full Height Pantry
Amtico Flooring
MASTER STATEROOM AFT
Queen Berth with Storage
Cedar Lined Hanging Closet
Nightstands with Drawers
Cabinet StorageÂ
TV & Soundbar Built in to Wall
Head with Separate ShowerÂ
Solid Surface Countertops
Mirorred Medine Cabinet
Tackle Room To Stbd
Solid Surface Countertops
Lockable Storage For Rods/ Reels
Storage Cabinets
Bunk Stateroom To Stbd
Over Under Bunks
Nightstands With Storage For Both Berths
Cedar Lined Hanging Locker
Vi Stateroom
Queen BerthÂ
Flip Up Bed With Storage Underneath
Cedar Lined Hanging Lockers
Storage Overhead In Bulkheads
Head With Separate Shower
Solid Surface Countertops & Floors In Head
Mirrored Medicine Cabinet
Companion Laundry
Complete the form below and one of our experienced sales brokers will be in touch soon.